Call 1800 555 777 Book a pickup →

Australia is on track for 1 million tonnes of end-of-life solar panel waste by 2035. The federal $24.7M Solar Panel Recycling Pilot is live from mid-2026, and Junkbird is positioned as a collection partner with downstream relationships to PV Industries and Sircel.

We collect panels, log frame and cell condition, and route each panel through the recovery chain. Glass, aluminium frames, copper interconnects and silicon all go back into the materials economy.

What's included

  • Site collection (residential and commercial roof-top swaps)
  • Bulk collection from solar installers
  • Safe transport — bunded crates, secured loads
  • Per-panel logging (serial, condition, downstream destination)
  • Certificate of recovery for each batch
  • Aligned with mandatory solar product stewardship (eff. mid-2026)

Indicative pricing

Pricing is per volume of the truck, not by item count. Final price is confirmed by the crew on arrival, before any work begins.

Load sizeIndicative price (incl. GST)Typical job
Per panel — single home swap$25 – $45Few panels, residential
Bulk — installer partnership$15 – $25 / panelRecurring volume
Commercial roof decommissionQuoted on siteWhole-system removal
Pallet of panels (~24 units)$500 – $700Stored, ready for pickup
Get my exact price →

Questions about this service

When does the federal Solar Recycling Pilot launch?

Mid-2026 — the $24.7M Solar Panel Recycling Pilot was announced 16 January 2026 by the federal Department of Climate Change, Energy, the Environment and Water. Junkbird is positioned as a service partner.

Are old panels actually recyclable?

Yes — glass, aluminium frames, copper interconnects and silicon can all be recovered. We route through PV Industries (NSW), the established AU specialist.

Can you collect from a rooftop?

We collect at ground level from a stack ready for pickup. For rooftop removal, your solar installer handles the takedown — we collect from the property after they're done.

Do you handle damaged or smashed panels?

Yes — damaged panels are bunded for safe transport. Inform us up-front so the crew brings the right containment.

Are you AS/NZS 5377 certified?

We partner with AS/NZS 5377 certified downstream processors. Our own AS/NZS 5377 certification at our Phase 1 site is in flight via Compass Assurance Services.

Ready to book?

60-second quote. No callback. No surprise pricing.

Get started →